Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 17, 2023

October 16, 2023

February 26, 2024

Maroon Bell Rd

Site Work

No Information to Display

$1,703,150.00

Public - City

img_map_placeholder

Maroon Bell Rd, Chino Hills, CA

Subscribe to View Full Documents

The work comprises, but is not limited to: mobilization; traffic control; installation of approximately 3,900 LF of 8-inch PVC C900 DR 14 pipe, including gate valves, fixtures, appurtenances, thrust blocks, blow offs, and air vac assemblies, and removal of portions of existing pipe. In addition, the work consists of installation of 111 ea 1-inch copper water service laterals and connecting to existing meters; installation of fire hydrants and valve assemblies, abandon-in-place existing water mains, pressure testing, disinfection, BacTs; trenching and pavement restoration, crack seal, slurry seal application, replacement of concrete cross gutter, speed hump, and restoration of pavement markings, raised markers, and striping; and other necessary work to complete the water replacement and street improvements. Special Requirements: 10% Bid Bond, 100% Performance Bond, 100% Payment Bond. It shall be mandatory, upon the contractor to whom the contract is awarded, and upon any subcontractor under him, to pay not less than the prevailing rate of wages as established by the City Council as they apply to the work being performed. Said prevailing rates are available from the State of California Department of Industrial Relations website (**See link under Description). Engineer's Estimate - $2,360,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

29 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects