Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 11, 2024

February 23, 2024

June 11, 2025

US-209

Paving, Site Work

No Information to Display

$5,000,000.00

Public - State/Provincial

img_map_placeholder

US-209, Milford, PA

164

11

4

4

Subscribe to View Full Documents

For the Rehabilitation of a Bridge in Pike County, Borough of Milford / Dingman Township, Commonwealth of Pennsylvania, State Route 209, Section 450. The Project Being Situated as Follows: From a Point on Sr 209 Approximately 0.5 Miles North of Us 206 at Segment * Offset * (Station 1030+00.00) to a Point on Sr 209 Approximately 0.4 Miles South of Sr 0006 at Segment 0010 Offset 0676 (Station 1043+50) With a Total Work Area Length of 1250 Feet (0.237 Miles). This Project Involves Rehabilitation Activities of the Existing Single Span Reinforced Concrete Open Spandrel Arch Bridge Carrying Sr 209 Over Saw Creek, in Pike County Including Bridge Deck Replacement, Substructure / Abutment Repairs, Retaining Wall, Moment Slab and Approach Slab Work. Traffic Will Be Maintained During Construction With a 2 Lane Temporary Road and Bridge Over Sawkill Creek and a Temporary Signal at the Sr 209 and Second Street Intersection. Other Work Includes Approach Roadway Reconstruction and Mill and Overlay Work, Guiderail Replacement, E&s Control Measures, Temporary Barrier, Guide Rail, Pavement Markings, Permanent Signs, Drainage Work as Necessary and Other Miscellaneous Construction Work. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 54.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - SR 209 Over Sawkill Creek *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects