Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

No Information to Display

No Information to Display

Longley Lane Dr.

No Information to Display

No Information to Display

$849,540.00

Public - City

img_map_placeholder

Longley Lane Dr., Reno, NV

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The contract is for all labor, materials, equipment, and incidentals required for the Innovation Drive Well. The Site of Work is located along Longley Lane Drive in Reno at the intersection of Innovation Drive on the west side of Longley Lane. The Work consists of the site development, construction of a new well house, and equipping for an existing well owned by the Truckee Meadows Water Authority (TMWA). Questions may be submitted in writing to the Contract Administrator up to three (3) business days before Bid Opening. Maria I. Dufur, Contract Administrator Truckee Meadows Water Authority 1355 Capital Boulevard Reno, NV 89502 (775) 834-8056 Fax (775) 834-8153: e-mail: mdufur@tmwa.com

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.