Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 1, 2025

December 16, 2023

No Information to Display

To Be Determined

Site Work

No Information to Display

$10,600,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, New York, NY

Our team is requesting plans for this project.

Subscribe to View Full Documents

Amtrak has issued a Request for Qualifications for construction services regarding renewal for two of four tunnels under the East River. The project would work to modernize tunnel infrastructure. Preparatory work is already underway in New York's Sunnyside Yard with major construction starting in early 2024 and continuing through 2027. The tunnels are used by Amtrak, NJ Transit, and Long Island Rail Road. The project is eligible for federal funding via the FY 2022-2023 Federal-State Partnership for Intercity Passenger Rail Program (FSP-NEC Program) created by the Infrastructure Investment and Jobs Act. An application for a full funding grant for the East River Tunnel Rehabilitation Project was submitted in March 2023 in response to the FSP-NEC Program Notice of Funding Opportunity. Amtrak issued this request for qualifications in anticipation of the Federal Railroad Administration funding decision expected in Fall 2023. CR Number 2103228 Sliding & swing doors, fire extinguishers & cabinets, fills, ready-mix concrete, concrete reinforcing, FRP trench grates, air compressors, polymer concrete covers, metal gratings, miscellaneous metals, tunnel railings, precast concrete planks, cast iron pipe & fittings, precast manholes & handholes, precast troughs, stainless steel drainage pipe, formwork, office cleaning, dumpsters, support of excavation, portable toilets, epoxy coatings, fencing, geotechnical instrumentation and monitoring, haul & dispose, asbestos abatement, lead abatement, universal waste and hazardous material removals, testing & inspections, commissioning, HVAC, signage, survey, trucking, plumbing, fire standpipe, demolition, dewatering, concrete crack & spall repairs, leak repair / grout injection, louvers, door hardware, electrical systems, low voltage, stray current monitoring system, lighting, communications, CCTV, life safety systems, PLC control systems, SCAD, fire alarm system, fire detection systems, blue light emergency call stations, ductbanks, trackwork, running rail, railroad ballast, resilient tie blocks, traction power, third rail, catenaryhttps://www.trains.com/trn/news-reviews/news-wire/amtrak-issues-request-for-construction-qualifications-for-east-river-tunnel-rehabilitation/ -

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.