Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

November 1, 2024

No Information to Display

Creek Bluff Dr

Site Work

No Information to Display

$800,000.00

Public - City

img_map_placeholder

Creek Bluff Dr, Sugar Hill, GA

Our team is requesting plans for this project.

Subscribe to View Full Documents

General: The work to be accomplished is to replace approximately 260LF of 60-inch diameter corroded, corrugated metal pipe with upstream and downstream headwalls AND replace the outlet structure (the original design for the structure is attached at the end of this RFP as APPENDIX A) for the adjacent small wet detention pond, along with associated tasks. Area covered: All the necessary labor, equipment, materials, and associated services provided in this contract will be applied to the limits of a permanent 20-foot easement AND temporary construction easement. Performance Bonds:, A one hundred percent (100%) performance bond, and a one hundred percent (100%) payment bond shall be furnished to City of Sugar Hill for any proposed work as required in RFP package or document. Failure to submit appropriate bonding will result in automatic rejection of proposal. Questions should be directed, in writing, to Joe Appling at jappling@cityofsugarhill.com. The deadline for questions is Thursday September 26, 2024, at 2:00 pm. The final addendum will be posted no later than September 27, 2024

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects