Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2024

October 28, 2024

December 27, 2024

To Be Determined

Renovation

No Information to Display

$100,000.00

Public - Federal

img_map_placeholder

To Be Determined, Patrick Air Force Base, FL

Our team is requesting plans for this project.

Subscribe to View Full Documents

Ammendment 1: Updated Small Business Set-aside Statement of Work has been ammended review full SOW Revision dated 23 Sep 2024. NAICS Code included. AFRC - Flight Simulation Electronic Security System Installation A. The contractor shall provide all labor, materials, equipment, transportation, and supervision to accomplish the following statement of work. All work shall be done in accordance with all local building codes, national electric codes and the requirements contained in the following statement of work and any attached drawings. Contractor to perform site visit prior to submittal of cost proposal. In addition, the contractor is directly responsible for complying with federal and state OSHA standards for all its employees. B. The Flight Simulator building is a controlled area under the protection of the Air Force Security Police. The Contractor shall comply with all security regulations imposed by this activity. The Contractor, subcontractors, and all their employees shall have access only to those areas required for execution of this work. Contractor shall provide a list of employees scheduled to work on this project. The list shall include any subcontractor's necessary to complete this project and submitted to the Contracting Officer for review and approval to access the Flight Simulator building for the contract work. All contractors and their subcontractors are to be U.S. Citizens to gain access to the Air Force Reserve Command facilities and be capable of receiving badging to access Patrick Space Force Base. Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation. Questions due date: Wednesday, 25 Sep 2024 by 12:00 P.M. EST All questions and quotes must be submitted to the following email address for consideration by the contracting team. Email to 45CONS.PKB.email@us.af.mil

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects