Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 3, 2025

No Information to Display

177 Lake St

Renovation

No Information to Display

$381,480.00

Public - City

img_map_placeholder

177 Lake St, Nashua, NH

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Although it received an A-1 rating in the FY20 CIP, the total cost for this project was under estimated. NFR currently spends money out of the budget making patch repairs to the roofing system in an effort to minimize water leaks. The building has a flat roof system, so the winter / spring weather is problematic due to the snow load and resulting melt, which results in ponding and eventually leaks. We find ourselves chasing our tail, fixing one leak only to have another appear. The current roof is a rubber membrane roof system that was installed 20 + years ago. The roof is a flat roof that covers the firehouse quarters, office areas, as well as two bays of our mechanical division shop area. The roof is made up of four separate roof areas, at four different levels. Since 2014, we have been patching leaks as they appeared. Currently, this roof replacement has been put off, due to funding for other city priorities. Our maintenance budget has been level funded over the last several years and cannot fund the cost of replacement. A new roofing system would have a 40-year rubber membrane warranty, and deliver a minimum 25-year life expectancy. Replacing the roof, would enhance the energy efficiency of the building as well as protect the assets inside. The pricing includes a 10% contingency for anticipated increased material costs. As of September 25, 2024, this project is included in the city's 2024 Capital Improvement Program (CIP). Further information regarding a design firm or timeline for construction has not been established yet. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.