Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2024

November 15, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

Multiple Locations, Keswick, ON

Our team is requesting plans for this project.

Subscribe to View Full Documents

The Corporation of the Town of Georgina (Town) is seeking bid submissions from qualified and experienced vendors (respondent) to: Install a sixty-nine (69m) long asphalt multi use path (3m wide); Install sixteen metres (16m) of concrete sidewalk; Replace seventeen (17m) of barrier/depressed curb; Install tactile walking surface plate(s); and Provisional site grading at an existing estimated 81m multi use path from West Street to Hawkins Street, Sutton, Ontario (site) with the specific purpose to ensure proper drainage on the path, and to avoid pooling or settlements; An optional site meeting will be held on the date and time stated in Table 1: Schedule of Events; Respondent must meet the Town Representatives in front of 16 Hawkins Street, Georgina, Ontario L0E 1R0, Canada to sign in. The above will constitute the work of the project and any provisional work may be included at the discretion of the Town Representative; Work conducted as a part of this contract must be in accordance with the most current General Conditions of Contract (OPSS. Muni 100) and OPSS MUNI 1350, OPSS 904, and O.P.S.S.351 for sidewalks, OPSS. 310 for asphalt and the related documents referred to in each specification; and Work must be completed to the satisfaction of the Town Representative no later than six (6) weeks from the date of the Kick-Off Meeting. Question Deadline: Tue Oct 8, 2024 2:00 PM

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects