Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 15, 2024

November 14, 2024

February 12, 2025

Multiple Locations

Site Work

No Information to Display

$900,000.00

Public - City

img_map_placeholder

Multiple Locations, Alcoa, TN

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The work of this contract generally consists of the following: The demolition and reconstruction of the superstructures for two boardwalk/bridged sections over Pistol Creek and Springfield Branch. As shown in the design plans. Bidding Documents may be obtained from the Development Services Department of the City of Alcoa after completing the Bid Document Request Form available online. BIDS shall be accompanied by a cashier's or bank check or BID Guarantee BOND in the amount not less than five percent (5%) of the BID made payable to the City of Alcoa, Tennessee, OWNER, and subject to the conditions provided in the INSTRUCTION FOR BIDDERS. The successful bidder will be required to furnish an acceptable Performance and Payment Bond in the amount of one hundred percent (100%) of the contract price, each bond. The project herein described is to be completed within Ninety Calendar (90) days from the date of the Notice to Proceed (NTP). If additional time is supported for procurement of materials, the Contractor and City will determine NTP date on when materials will be received. Liquidated damages for delay of completion of contract will be in accordance with the Agreement (Contract). Bidders may withdraw their bid within twenty-four (24) hours of the bid opening providing certification of an error in their submittal is forwarded to the Owner. Thereafter, no Bidder may withdraw his bid within sixty (60) days after the actual bid date of the opening thereof. All bidders must be licensed contractors to perform the type construction herein described by Tennessee Code Annotated, Title 62, Chapter 6, Amended by Chapter 9 and Chapter 406 of the Public Works Act of 1977. The project is funded by local funds. The CONTRACTOR shall comply with all State, Federal, and Local laws and/or regulations. The OWNER reserves the right to waive any irregularities or reject any or all bids. Question Deadline 10/11/2024 All questions about the meaning or intent of the Contract Documents shall be submitted to Engineer in writing. Replies will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than four (4) days prior to the date for opening of Bids will not be answered. Only questions answered by formal written Addenda will be binding.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.