Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2024

February 3, 2025

No Information to Display

Augusta Bottom Rd

Demolition, New Construction, Paving, Site Work

No Information to Display

$2,000,000.00

Public - County

img_map_placeholder

Augusta Bottom Rd, Augusta, MO

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The proposed work includes the furnishing of materials, tools, equipment and labor necessary to construct Augusta Bottom Road Bridge Replacement, STP-7302(693) in St. Charles County, Missouri. The construction shall include all work incidental to the furnishing of materials, tools, equipment and labor necessary to remove the existing bridge structure and construct an aluminum box culvert along with grading and asphalt paving in St. Charles County, Missouri. All bidders must meet the MoDOT requirements as a Contractor at least seven (7) days prior to bid opening in accordance with Section 102.2 of the St. Charles County Standard Specifications for Arterial Highway Construction A Performance Bond and Payment and Materials Bond are required. Each Bid must be accompanied by a Cashiers Check or Certified Check, or a Bid Bond executed by the Bidder and an approved Surety Company and payable to the County, in an amount not less than Five Percent (5%) of the Sum Total of the Base Bid. The DBE goal for this letting is a minimum of 7% of the total contract amount. The County reserves the right to reject any and all Bids, to waive informalities therein to determine the lowest, responsive, responsible bidder, and to approve the bond. No Bid may be withdrawn for a period of sixty (60) days subsequent to the specified time for receipt of Bids. The County intends to issue the Notice to Proceed on or about February 3, 2025. MODOT - Augusta Bottom Road Bridge Replacement

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.