Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2024

March 2, 2026

July 31, 2026

4451 Laporte Ave

Renovation

No Information to Display

$200,000.00

Public - State/Provincial

img_map_placeholder

4451 Laporte Ave, Fort Collins, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Reference Number 0000363613 Job Location: Fort Collins, CO Bid opening- Online Bid Opening: https://teams.microsoft.com/l/meetupjoin/19%3ameeting_ZDZhM2U2NjQtNGI4OC00MjAyLTljNmYtZDFhZGQ2NWY0NjQ0% 40thread.v2/0context=%7b%22Tid%22%3a%22afb58802-ff7a-4bb1-ab21-367ff2ecfc8b%22%2c%22Oid%22%3a%22cbc2003b-1393-43fd-a7ad993a92cb3d5f%22%7d Meeting ID: 298 503 987 268 Passcode: cWhPwk Dial in by phone +1 970-628-0547,,250231020# United States, Grand Junction Opening of the bid submittals will be a virtual public bid opening via Microsoft Teams Meeting platform. Virtual public bid opening will take place at the date and time identified in Section I.E. Refer to Appendix H2 for meeting link and call-in number. The State of Colorado, Institution of Colorado State University (CSU) is soliciting bids from Contractors for the Pitkin and Simons Switchgear and Transformer Replacement. The Work of this Contract consists of replacement of power distribution center and switchgear at Pitkin East Switching Station, as well as replacement of Utility Service transformers, primary cable, secondary service entrance cable, and Main Service Switchboards at the Simons Engineering Research Center (ERC). Transformers and switchboards will be downsized to anticipated loads. Question Deadline 10/09/2024 at 12:00 PM MT Questions are submitted online No Communication regarding the project with CSU Staff/Stakeholders, City of Fort Collins, Poudre Fire Authority or Larimer County Staff during the procurement, outside of the RFC process or scheduled procurement milestones is not permitted. Bonding Requirements - Bid Bond 5 % - Performance Bond 50 % - Labor and Materials Bond 50 % Anticipated Construction Start March 2026 Anticipated Construction Finish July 2026 The State reserves the right to reject any or all proposals on the basis of being unresponsive to this AFB or for failure to disclose requested information.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects