Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 28, 2024

November 27, 2024

November 27, 2026

Hull St

Outdoor Lighting, Paving, Site Work

No Information to Display

$300,000.00

Public - City

img_map_placeholder

Hull St, Richmond, VA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Hull Street Improvements UPC 15959. The project will attain a minimum of 14% or more participation by DBE The period of performance for the project shall be 730 consecutive calendar days from the Notice to Proceed. Such Bid Bond or check shall be delivered, on or before the due date for this Invitation for Bids, to the City's Department of Procurement Services, 900 E. Broad Street, Room 1104, Richmond, Virginia 23219, in an envelope marked with a reference to this Invitation for Bids by number and the bidder's name. The bidder shall deliver such Bid Bond or check with the understanding it shall guarantee that the bidder will not withdraw its bid during the acceptance period indicated in the Invitation for Bids except as defined in paragraphs 2.42 and 3.1 of the Contract Documents; that if the bid is accepted, the bidder will enter into a formal Contract with the Owner in accordance with the Contract Documents; and that Performance and Payment Bond, and Certificate of Insurance will be given; and that in the event of the failure to enter into said Contract and give said Bonds and Certificate of Insurance within fifteen(15) days after it has received notice of acceptance of its bid, the bidder shall be liable to the Owner for the full amount of the bid guarantee or the difference between the bid for which the bond was written and the next low bid as representing the damage to the Owner. Forfeiture under a Bid Bond shall not exceed the lesser thereof. Any bidder submitting a bid for a construction Contracts in excess of $100,000 shall submit to the City a bid guarantee of not less than five percent (5%) of the bid amount set forth in item 14 of the Bid Form. Such security may be a certified check or a cashier's check or a Bid Bond made payable to the Owner. The Owner may require bidders submit bid security for lesser bid amounts, however, this will be so stated in the Invitation for Bid. This Project is federally funded. The contract is subject to federal contract provisions and the Davis Bacon General Wage Decision. Should there be any discrepancies among mandatory requirements of federal, state and/or local laws or regulations, the most restrictive shall apply. Dominion Energy will supply and install the light poles, luminaire arms, luminaires and wiring. The following private utilities have completed their relocations: Comcast Crown Castle Fiber Windstream Dominion Energy All bids must be signed in order to be considered. If the bidder is a firm or corporation, the bidder must show the title of the individual executing the bid and a resolution authorizing the individual to sign the bid and subsequent contract. Each bidder shall visit the site of the proposed Work and fully acquaint himself with conditions relating to construction and labor, so that he may fully understand the facilities, difficulties and restrictions attending the execution of the Work under the Contract. The failure or omission of any bidder to receive or examine any form, instrument, addendum, or other document or to visit the site and acquaint himself with the conditions there existing, shall in no way relieve any bidder from the obligation with respect to his bid or to the Contract. The submission of a bid shall be taken as conclusive evidence of compliance with this section. The City reserves the right to audit all aspects of the Contract: the vendor's financial capability and accounting system, basis for progress payments, compliance with applicable laws, as well as appropriate vendor records. The City further reserves the right to review, on demand and without notice, all files of any subcontractor employed by the Contractor to provide services or commodities under this Contract where payments by the City are based on records of time, salaries, materials or actual expenses. In cases where the vendor maintains multiple offices, records to be audited should be maintained locally or be deliverable to a location in the metro-Richmond area. The Owner reserves the right to waive minor informalities and irregularities. A minor informality or irregularity is one that is merely a matter of form and not of substance or some immaterial defect in a bid or variation of a bid form that can be corrected or waived without being prejudicial to other bidders. The defect or variation is immaterial when the effect on price, quantity, quality or delivery is negligible. Project closeout shall entail a number of conditions and terms be satisfactorily met before the final payment per the last schedule of values. Prior to close out of the project the A&E of Record shall certify there are not outstanding items pending on the project punch list and also the receipt of the Affidavit of Claims. Close out of the project shall be at the discretions of the A&E of Record and PM or PM designate. Bids containing any conditions, omissions, unexplained deletions or alterations, or items not called for on the bid sheet may be rejected by the City as being incomplete or non-responsive.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.