Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2024

November 11, 2024

January 10, 2025

To Be Determined

Site Work

No Information to Display

$80,000.00

Public - County

img_map_placeholder

To Be Determined, Riverside, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

The Riverside County Superintendent of Schools, herein referred to as SUPERINTENDENT will receive sealed bids for the Migrant Head Start Playground and PIP Installation Project, herein referred to as Project. This Project must be completed within 60 calendar days, herein referred to as Contract Time, as provided in the Bid and Contract Documents, herein referred to as Bid Documents. Prospective Bidders, herein referred to as Contractor, must review the Bid Documents for more complete information regarding this Project and submission of bids. Davis-Bacon Payment of Prevailing Wage Rates: All contractors and subcontractors performing on federal contracts (and contractors or subcontractors performing on federally assisted contracts under the related Acts) in excess of $2,000, shall pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, as determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area (40 USC 276a; 29 CFR Parts 1, 3, 5, 6 and 7.). Apprentices and trainees may be employed at less than predetermined rates. Apprentices must be employed pursuant to an apprenticeship program registered with the Department of Labor Department or with a state apprenticeship agency recognized by the Department. Trainees must be employed pursuant to a training program certified by the Department. Contractors and subcontractors on prime contracts in excess of $100,000 are also required, pursuant to the Contract Work Hours and Safety Standards Act, to pay employees one and one-half times their basic rates of pay for all hours over 40 worked on covered contract work in a workweek. For all projects in excess of $60,000, SUPERINTENDENT S third-party labor compliance contractor will administrate all aspects of SUPERINTENDENT S labor compliance program (LCP). Payment of Prevailing Wage Rates: Pursuant to California Labor Code section 1720 et seq., it shall be mandatory upon CONTRACTOR to and subcontractors are required to pay prevailing wage. Pursuant to the Business and Professions Code 7028.15 and Public Contract Code 3300, Contractor Shall Possess the California Contractor S License(S) Classification B-general Building Contractor or C-61-limited Specialty Classification and D-12-synthetic Products Contractor. Subcontractors Must Possess the Appropriate Licenses for Each Specialty Subcontracted. Each Contractor Shall Be a Licensed Contractor Pursuant to the Business and Professions Code and Shall Be Licensed in the Appropriate Classification for the Work to Be Performed. Failure to Have the Specified License or Licenses Shall Render the Bid Non Responsive and Shall Act as a Bar to the Award of the Contract to Any Contractor Not Possessing the Specified License at the Time of Bid. Licenses Acceptable for the Work Are Intended in the Bid Package Listed Above, and More Than One License May Be Required. The List in No Way Relieves Contractor From Fulfillment of Any Legal Requirement or Licensing Necessary for Performance of Their Work. Question Deadline 10/04/2024 at 2:00 PM PT Questions and/or Requests for Information (RFI) concerning this Project must be made in writing and be sent via email to epurchasing@rcoe.us. The email subject line must state: PreBid RFI for Migrant Head Start Playground and PIP Installation Project. Project Locations and Order: 1. Calexico Center 1120 East 7th Street, Calexico, CA 92231 2. El Centro Center 375 South 1st Street, El Centro, CA 92243 3. Brawley Center 1455 East Magnolia, Brawley, CA 92227 4. Thermal Center 87-220 Church Street, Thermal, CA 92274

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.