Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

November 7, 2024

No Information to Display

106 Cobblestone Terrace

Site Work

No Information to Display

$700,000.00

Public - State/Provincial

img_map_placeholder

106 Cobblestone Terrace, Newark, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Kitchen drain Line was plugged and found to be full of grease. Line was snaked and when the camera was used it found a large void 38 ft from the sink under the living room where the pipe appears to be missing. I am not 100% sure how much of the line has to be excavated or how much can be sleeved. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of the project, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Point of Contact. Contract term: 30 days after completion of project SCOPE OF WORK includes, but is not necessarily limited to the following: Determine condition of cast iron pipe with camera to determine how invasive repair will be. 1. Expose drainpipe 2. Open drainpipe 3. Run camera down drainpipe to where it goes out of the house to check condition of drainpipe 4. Repair as necessary: A. unplug / replace pipe where it is excavated B. epoxy sleeve pipe from kitchen to bathroom 5. Contractor must block off area excavated per DDSO specs (safety plan) 6. Put soil back in excavation area / tamp / 7. Pour concrete in excavated area / must drill in existing concrete and grout in pieces of rebar before pouring new concrete for stability. Any questions not asked at the site visit must be submitted in writing to FL.Purchasing@opwdd.ny.gov within 2 business of the site visit. Final Date for Receipt of Questions: October 2, 2024

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.