Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 22, 2024

November 21, 2024

September 17, 2025

725 Harbor Plaza

New Construction, Site Work

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

725 Harbor Plaza, Long Beach, CA

Our team is requesting plans for this project.

Subscribe to View Full Documents

City of Long Beach, California, acting by and through the City s Board of Harbor Commissioners ( City ) will receive, before the Bid Deadline established below, Bids for the following Work: Maintenance Facility Electric Vehicle Charging Stations at 725 Harbor Plaza LONG BEACH, CALIFORNIA Copies of all Port insurance endorsement forms, SBE/VSBE Program forms, Harbor Development Permit Applications and other Port forms are available at online All questions, including requests for interpretation or correction, or comments regarding the Contract Documents, must be submitted no later than October 15, 2024, at 5 p.m. Questions received after the pre-Bid question deadline will not be accepted. Neither questions nor answers are part of the Contract Documents, unless the question and answer result in an addendum. Questions must be submitted electronically through the online System. Emails, phone calls, and faxes will not be accepted. Questions submitted to City staff will not be addressed and Bidder will be directed to the online System. The Work required by this Contract includes, but is not limited to, the following: Installation of twelve (12) Electric Vehicle (EV) chargers and all improvements for six (6) future chargers. See Section 01 11 00, Summary of Work in the Technical Specifications.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.