Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 16, 2024

November 15, 2024

February 13, 2025

Spring Ridge Pkwy

Paving, Site Work

No Information to Display

$500,000.00

Public - County

img_map_placeholder

Spring Ridge Pkwy, Frederick, MD

25

5

Subscribe to View Full Documents

Spring Ridge Parkway Sidewalk Improvement. Question Deadline 10/04/2024 at 4:00 PM ET All communications relative to the bid for this Work shall be directed to Justin Hedges, CPPB, PMP (301-600-1002), Procurement Supervisor prior to the opening of Bids All questions relating to interpretation of the Contract Documents or requests for clarification must be submitted in writing. E-mail: jhedges@frederickcountymd.gov. Direct all questions to the buyer: JHedges@frederickcountymd.gov The project is located in Frederick County, Maryland. The project will be bid as the Spring Ridge Parkway Sidewalk Improvement project. The County project includes sidewalk improvements along the eastern side of Spring Ridge Parkway from MD Route 144 intersection with Spring Ridge Parkway to connect existing curb ramp and sidewalk facilities approximately 800 feet to the north. The project starts at MD Route 144 (Southern project limit) and extends to the Exxon/Tiger Mart Convenience Store at 6067 Spring Ridge Pkwy, Frederick, MD 21701 (Northern Project Limit) and projects proposed features will primarily provide a parallel concrete sidewalk along the existing legal right-of-way and roadway frontage area along with the previously acquired and established 25-foot perpetual/permanent easement of the County for a new pedestrian pathway connection. Work includes upgrading the existing drainage system and adding a small segment of new curb & gutter to the existing eastern roadway edge of Spring Ridge Parkway where the sidewalk is directly adjacent to the road. All pedestrian facilities within the project limits are designed to the maximum extent feasible and in accordance with the latest ADA guidelines. Stormwater management facilities will include regrading the existing swale to provide a three-foot bottom width ditch and also the construction of one Filterra Bioretention System unit as determined acceptable by DPP plan approva.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.