Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

November 7, 2024

May 30, 2025

To Be Determined

Site Work

No Information to Display

$350,000.00

Public - City

img_map_placeholder

To Be Determined, Westborough, MA

12

13

4

4

Subscribe to View Full Documents

Dog Park Construction. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Questions can be emailed to Jennifer Kirkland at jkirkland@westboroughma.gov with subject line Dog Park Bid -Questions. Deadline for questions is October 2nd, 2024. The Work consists of constructing a public dog park with earthwork, paving, fencing, utility work, landscaping and all work incidental thereto, in accordance with the Specifications and conceptual plans attached hereto. Additional drawings showing details in accordance with which the Work is to be done may be furnished by addendum from time to time during the bidding period by the Owner or its Architect/Engineer, and shall then become a part of the Contract Documents. The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the Work and as herein specified. The Work to be done and paid for under any item shall not be limited to the exact extent mentioned or described but shall include all incidental work necessary or customarily done for the completion of that item. Work covered by this contract includes but may not be limited to site-work; construction; re-construction; alterations; remodeling or repair of the public works Project described in this paragraph 1.03 including the following major work: 1. Installation of asphalt and concrete pavement 2. Installation of water line and drinking fountain 3. Installation chain link fence 4. Installation of trees and lawns 5. Installation of site furnishings 6. Installation of site signage 7. Substantial Completion date is May 31st, 2024 8. Final Completion date is June 30 th , 2024

27 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.