Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 15, 2024

November 15, 2024

May 15, 2025

To Be Determined

Site Work

No Information to Display

$200,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Lees Corner, BC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

The contractor must lop and scatter 11,000 meter existing log fence along the edge of the existing fence right of way. All wire must be cleaned up and removed. The contractor must prep and clear the existing right of way for new 4-strand barbed wire fence. The contractor must purchase and deliver and distribute bundles of materials along the prepared right of way for 4 strand barbed wire fence according to the Ministry specifications which are included in this package. The contractor will need to purchase materials for 11km of fencing.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects