Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

April 23, 2025

October 23, 2031

To Be Determined

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - County

img_map_placeholder

To Be Determined, Albuquerque, NM

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Reference Number: 0000361952 The purpose of this RFP is to prequalify multiple architectural/engineering firms to provide a variety of engineering services to the Water Authority on an as needed basis. The engineering services requested may include survey services, studies, infrastructure master- planning, asset management planning, preliminary and final design, and construction management related services for a variety of projects, such as, but not limited to, plant facility, water line, and sanitary sewer line construction and rehabilitation. The facilities include, but are not limited to, the San Juan-Chama Drinking Water Plant, Southside Water Reclamation Plant, Ground Water Facilities, Reuse Facilities, Arsenic Treatment Facilities, Lift and Vacuum Stations, and Odor Control Facilities. The services may include architectural, landscaping, civil, structural, electrical, instrumentation and controls, or other related engineering services as determined by the Water Authority. Possible services consisting of field investigations and surveying, geotechnical investigations and testing, electrical and mechanical engineering studies and analysis, permitting and environmental studies, NACE inspections, and drainage reports may also be required. It is the Water Authority's intent to award to multiple engineering firms. The Water Authority does not guarantee any number of projects to be awarded under this RFP. Question Deadline 10/23/2024 at 1:45 PM MT Questions are submitted online : Yes . Purchase Type Duration: 6 years The method of Contractor Selection has not been Determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.