Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

November 11, 2024

March 20, 2026

Multiple Locations

New Construction, Paving, Site Work

No Information to Display

$3,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Winnipeg, MB

20

3

Subscribe to View Full Documents

Phase I The Work Involves Transportation of All Material and Equipment Required for the Construction of the Acrow Bridge and Related Roadworks via the Winter Road to the Project Site. Phase Ii The Work Involves Excavation, Replacement of Unsuitable Material and Backfill for Foundation Construction, Construction of Cast-in-place Concrete Foundations, Assembly and Launching of Permanent Acrow Bridge, Installation of Timber Deck, Guardrails and Precast Concrete Approach Barriers, and Related Roadworks to Open the River Crossing Over Lawford River. Phase Iii Return of the Acrow Bridge Launching Components to Manitoba Transportation and Infrastructure Stony Mountain Bridge Yard and Demobilization From the Site. Completion Model the Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Completion Dates and Liquidated Damages Sub Completion 1 All Work for Phase 1 as Detailed Under the Description of Work Shall Be Completed by No Later Than March 20, 2025. The Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date. Daily Liquidated Damages After This Specific Completion Date Will Be Charged to the Contractor at the Rate of One Thousand Five Hundred ($1,500.00) Dollars Per Calendar Day Until the Work is Completed. Sub Completion 2 All Work for Phase 2 as Detailed Under the Description of Work Shall Be Completed by No Later Than December 31, 2025. The Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date Daily Liquidated Damages After This Specific Completion Date Will Be Charged to the Contractor at the Rate of One Thousand Five Hundred ($1,500.00) Dollars Per Calendar Day Until the Work is Completed. Completion All Work as Detailed Under the Description of Work Shall Be Completed by No Later Than March 20, 2026. The Contractor Shall Ensure All Necessary Work is Completed to Accommodate This Date. Daily Liquidated Damages After This Specific Completion Date Will Be Charged to the Contractor at the Rate of One Thousand Five Hundred ($1,500.00) Dollars Per Calendar Day Until the Work is Completed. In Addition to the Daily Liquidated Damages, a Lump Sum Liquidated Damage of Twenty Five Thousand ($25.000.00) Dollars Will Be Charged to the Contractor if the Work Associated With Interim Completion Date Ii is Not Completed by December 31, 2025. In Addition the Lump Sum Liquidated Damages Will Be Charged to the Contractor on a Recurrent Annual Basis Until Substantial Completion. Seasonal Shutdown Date the Seasonal Shutdown for Roadwork is October 15 of Any Given Year. The Seasonal Shutdown for in-stream Work is April 1-june 30 of Any Given Year. Question Acceptance Deadline: 2024/10/04 12:00:00 PM CDT All enquiries regarding the Work may be made to: Adam Brown P. Eng. Junior Structures Engineer 600-215 Garry Street 431-279-1546 Adam.Brown@gov.mb.ca Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.