Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2024

May 1, 2025

No Information to Display

4 Wing Cold Lake

New Construction, Site Work

No Information to Display

$500,000,000.00

Public - Federal

img_map_placeholder

4 Wing Cold Lake, Cold Lake, AB

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe to View Full Documents

This is NOT a bid solicitation. This is a notice to trade contractors, vendors, and suppliers (herein noted as "Parties") to pre-qualify for the opportunity to tender this project, and to provide the Parties an opportunity to apply for security clearances. Note there is no guarantee that the project will proceed or that any security clearance(s) will be granted under the sponsorship process in a timley fashion or otherwise. EllisDon Construction Services Inc. (EllisDon) as the Design Builder, along with its design partner, Stantec have been contracted to provide design services and constructability oversight to complete the design of the Royal Canadian Air Force (RCAF) infrastructure that will support the Future Fighter Capability Project (FFCP). The infrastructure will provide shelter and a working environment capable of supporting the operation and maintenance of a yet to be determined advanced fighter aircraft. Construction of a new a Fighter Squadron Facility consisting of two fully operational Tactical Fighter Squadrons (TFS) and the Operational Training Unit (OTU), including but not limited to: offices, administrative spaces, mission planning rooms, briefing / de-briefing rooms, meeting rooms, classrooms, auditorium, speciality training rooms including simulators (SIMS) accommodations and Part-Task Trainers accommodations, hangars, maintenance bay facilities, specialty aircraft maintenance labs, shops and storage, IT offices and server rooms, building support spaces, and common spaces. This work package will also include the construction of nearby airfield pavements, apron and taxiway access lane edge lighting, and apron flood lighting consisting of concrete and asphalt. Construction of infrastructure will encompass the following scopes of work. Scope of work, using Masterformat Divisional breakdown as a reference, may include, but are not limited to: Masterformat Division Scope of work 07 10 00 Foundation Dampproofing & Waterproofing 08 10 00 Doors, Frames & Hardware 08 34 16 Hangar Doors 08 36 00 Overhead and Sectional Doors 11 13 16 Loading Dock Equipment 32 16 00 Site Concrete 32 10 00 Asphalt Paving 32 16 00 Concrete Apron 32 90 00 Landscaping 32 31 00 Fencing 32 10 00 Pavement Markings Official bid documents must be obtained from www.merx.com.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.