Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

November 1, 2024

January 1, 2026

1100 North Ave

New Construction, Site Work

No Information to Display

$42,500,000.00

Public - State/Provincial

img_map_placeholder

1100 North Ave, Grand Junction, CO

3

9

2

6

Subscribe to View Full Documents

Reference Number 0000362999 Job Location: Colorado Mesa University Main Campus 1100 North Avenue Grand Junction, Colorado United States 81501 Colorado Mesa University welcomed its largest class of in-coming freshman and new to CMU students on August 16, 2024. The number of new freshmen increased by 30% while overall growth in enrollment is hovering around 6%. Increased enrollment results in greater demand for on-campus housing, especially with the current high cost and scarcity of affordable housing opportunities for students competing with the public in the surrounding area for off-campus housing. Current high rental costs in the community have added another layer of complexity for students wanting to live off campus as well, thus placing a higher demand for on-campus housing that presents a more affordable solution. This current phase of student housing proposes between 316 and 324 beds in a four or five story, 105K - 128k sf facility that will be located within CMU's new Formation District. The five-story option would provide ground floor tenant finish retail, while the four-floor option proposes a utility basement. The Fixed Limit of Construction costs has been set at $42,500,000. Design is projected to begin in early October 2024 with construction of foundations to follow in January 2025. The preferred delivery date for Centennial Village is prior to the start of the fall semester, August 2025. An alternative, though much less desirable finish date for the project, would be prior to the start of the spring semester in January 2026. The final schedule will be developed with the AE team, CM/GC and Colorado Mesa University. Question Deadline 09/19/2024 at 11:00 AM MT Questions are submitted online No, Respondent initiated requests for clarification will be received on online. Anticipated Construction Start/Finish 11/1/24 - 1/1/26 The State reserves the right to reject any or all proposals on the basis of being unresponsive to this RFP or for failure to disclose requested information.

40 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects