Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2024

February 3, 2025

June 3, 2026

7 St Francis Memorial Dr

Addition, Demolition, Renovation, Site Work

No Information to Display

$30,000,000.00

Public - State/Provincial

img_map_placeholder

7 St Francis Memorial Dr, Barrys Bay, ON

7

6

Subscribe to View Full Documents

Reference Number 0000278373 The intent of this Request for General Contractor Pre-Qualification is for St. Francis Memorial Hospital (referred to as SFMH, or Owner) to pre-qualify a list of up to five(5) General Contractors suitable to provide construction services for an addition and renovation of emergency department of St. Francis Memorial Hospital Question Deadline 09/25/2024 at 2:00 PM ET PART 1: This part of project consists of two phases. Phase 1 is the construction of the new Emergency Department addition, embankment stabilization, and temporary gravel parking lot. This area is approximately 6,000 sq.ft excluding exterior works. Phase 2 encompasses the renovation of a portion of the existing building, the main Entrance and Ambulatory Care areas - approximately 7,860 sq.ft, as well as the construction of a new heliport. In both phases there will be intermediate stages of work to permit the continuous operation of the hospital. Some will necessitate work stoppages to allow the hospital to relocate operations. The General Contractor shall co-ordinate with the hospital with respect to this. PART 2: The slope rehabilitation project involves a 170m span, requiring sub-excavation to a 1:1 slope and replacement with R-50 rip-rap material underlain with geotextile to achieve a minimum 1.75:1 slope. The rip-rap will be 500mm thick at the top, increasing in thickness down the slope, and keyed into existing material at the toe to a depth of 600mm and a length of 900mm. The rip-rap plan area covers approximately 1925m², with an additional 3515m² area to be grubbed for material removal and slope preparation. Additional work includes relocating a fence section and constructing rip-rap pads at storm outfall outlets. Additionally, an area of approximately 2,000 square meters on the north side of the hospital site to be graveled and prepared for temporary parking. Key Details: Location: 7 St. Francis Memorial Dr., Barry's Bay, Ontario, KOJ 1B0 Project site: South and west side of existing building Project: Redevelopment of the Emergency Department, Ambulatory Services, Registration and Health Records areas, Helipad construction and Slope stabilization at Project site. Estimated construction value: $20-$30 million Construction schedule: 24-28 Month from commencement of construction Official bid documents must be obtained from www.merx.com The project value listed reflects the total project estimate.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.