Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 11, 2024

November 11, 2024

March 30, 2026

3315 Gundry Ave

Demolition, Site Work

No Information to Display

$2,859,000.00

Public - City

img_map_placeholder

3315 Gundry Ave, Signal Hill, CA

26

18

2

Subscribe to View Full Documents

Gundry Reservoir Roof Replacement and Rehabilitation Project. The engineer's estimate is $2,859,000 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $5000. Start/Delivery Date Gundry Reservoir may be scheduled for shutdown on or about October 1st, 2025. Material items must be procured in advance of shutdown. Project Duration 120 Working days Question Deadline 10/04/2024 at 12:00 PM PT Online Q&A Yes License Requirements Prime Contractor shall possess General Engineering A license Scope of Services The Work under these Contract Documents includes, providing all labor, products, materials, tools, equipment, and incidental services for the Gundry Reservoir Rehabilitation Project including (but not limited to) : 1. Demolition, dismantling, removal, and disposal of the existing Gundry reservoir and sand basin roofing system, supporting columns and footings, concrete coatings, piping and pipe support/hangers coatings and hardware, overflow grating, transducer and wiring as needed, sample piping as needed and landscaping to accommodate drainage improvements, including a small detention basin. Salvage materials as described in the Contract Documents. Salvage includes pipe supports 2. Site earthwork consisting of minor grading to accommodate a drainage swale and retention basin. 3. Removal of existing coatings and linings, crack repair and relining for the Gundry Reservoir: One 5 MG semi below grade, circular existing concrete tank for potable water storage and associated appurtenances. 4. Tank piping including: Proposed Inlet piping (12-inch); rehab existing outlet piping (4-outlets of unknown size); an inlet piping sample line. 5. Aluminum Roofing Installation on the existing concrete reservoir walls and existing sand basin concrete walls. 6. Coordination with City of Signal Hill and the MWD operations for scheduling valve closures to isolate pipelines and Reservoir shutdowns and other coordination as necessary to accomplish the work of the project. Include provisions to handle water when dewatering isolated pipelines. 7. Ancillary work including mobilization, bonds, permits, and demobilization; temporary erosion control including a Storm Water Pollution Prevention Plan (SWPPP); traffic control and permitting.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.