Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2024

December 9, 2024

June 7, 2025

To Be Determined

Site Work

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

To Be Determined, Cedar City, UT

24

17

25

2

Subscribe to View Full Documents

The Project includes the following Work: Connection of temporary tank to existing system, removal of existing tank, construction of 250,000-gal. bolted steel tank, water meters, fire hydrants, upgrades to existing well house. All relevant site work as shown in the drawings and specifications including manufacturer's design and supply of tank. Instructions to Bidders: For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel: Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig iron and direct reduced iron Domestic Preference: This project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58, 70901- 70953. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States Question Deadline 10/03/2024 Questions are to be submitted in writing to Rianna Howard ñ rhoward@ensignutah.com or Curtis Nielson ñ cnielson@ensignutah.com.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects