Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

April 4, 2025

August 22, 2025

County Rd 20

Service, Maintenance and Supply

No Information to Display

$1,675,000.00

Public - City

img_map_placeholder

County Rd 20, Firestone, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Reference Number 0000362984 Replacement of off-system bridge structure number Rehabilitation of off-system bridge structure number FRSTN20.0_15.0A, which carries Weld County Road 20 over the Coal Ridge Ditch. The bridge substructure and superstructure are significantly deteriorated resulting in the replacement of the bridge with the Concrete Box Culvert. The major components of the project include the following items: Removal of the existing bridge structure Installation of new Concrete Box Culvert The design plans and specifications that relate to this RFP will be provided as an addendum. The Town is soliciting professional services necessary to manage construction management services for the Weld County Road 20 Bridge Replacement Project. This project is partially funded through the Colorado Special Highway Committee Off-System Bridge Grant Program. The Consultant will consult with and advise the Town and act as the Town's Representative. As directed, the Consultant will have authority to act on behalf of the Town. The consultant will be on-site to continuously observe the contractor's daily work (where a major portion of Consultant project staff time is spent observing work in progress), evaluate the quality of the executed work, and determine in general if the work is proceeding by the Contract Documents. The Consultant will be responsible for all aspects of managing and ensuring compliance with the Colorado Special Highway Committee Off-System Bridge Grant Program during Construction. The project construction phase is anticipated to be 140 Working Days. Questions are submitted online No, Questions related to this Proposal should be emailed to Kiran Bhusal at kbhusal@firestoneco.gov All answers to questions received will be sent in a formal addendum (if needed), by 9/30/2024.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.