Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

December 30, 2024

June 30, 2025

400 Jones Ferry Rd

Renovation

No Information to Display

$75,000.00

Public - County

img_map_placeholder

400 Jones Ferry Rd, Carrboro, NC

24

11

2

4

Subscribe to View Full Documents

The Project consists of furnishing all materials, labor, eguipment, tools, etc. unless otherwise specified, for the complete and operable installation of: Project includes replacement of monumental staircase in the central atrium between the upper and lower levels of their Administration Building. The existing stairs, structural supports, and railing including around the atrium will be demolished and replaced with an alternate layout. Electrical will be updated to meet emergency egress code. The lower-level rock garden extents will be adjusted to accommodate the new stair layout. The project includes furnishing and installing new stairwell, structural supports, lighting fixtures, repair to adjacent finishes, all associated appurtenances and other work as described in the Specifications and as shown on the Drawings. Question Deadline 10/03/2024 All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineering Design Project Manager (Wiley|Wilson) via email only to: kfinch@wileywilson.com. Questions received less than five (5) days prior to the date for opening of Bids may not be answered. Orange Water and Sewer Authority has adopted a minimum ten (10%) percent goal for participation by minority businesses in the total value of the work for this project in accordance with Section 143-128.2 of the General Statutes of North Carolina. Orange Water and Sewer Authority reguires the Project to be at Substantial Completion within 135 consecutive calendar days from date of Notice to Proceed and at Final Completion 160 from date of Notice to Proceed. Orange Water and Sewer Authority reserves the right to accept or reject any or all Bids, to waive any and all informalities, and to disregard all nonconforming or conditional Bids or counter Bids, and to accept the Bid that will be in the best interest of Orange Water and Sewer Authority.

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.