Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

October 21, 2029

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Richfield, UT

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

UDOT Region 4 Equipment Sand Blasting and Painting BASIS OF AWARD It is anticipated that this solicitation will result in One (1) contract award. The methodology that will be used to determine contract award is: Low-cost bid among those bidders determined to be responsive and responsible will be awarded contract. CONTRACT TERM AND PRICE GUARANTEE The contract(s) resulting from this solicitation will be for a period of Five (5) years with no renewal options for additional years. Background: UDOT has a variety of equipment that are used in extreme weather conditions and situations that can compromise the material and paint. These extreme situations can expose the metals, which could cause the equipment to malfunction or the metals to rust, corrode, etc. Corrosion of the metal and malfunctions will require frequent repair by maintenance professionals. For preventative maintenance and after repair, UDOT requires that these items be sand blasted to remove all of the old paint along with the galvanized coating to expose the bare metal. UDOT will then require that these items be repainted. Equipment is initially brought in to the UDOT Richfield Shop for evaluation, and from there is then sent out for repair. Scope of Work: The specification defines the minimum acceptable standards along with requirements for sand blasting, repairing and painting various pieces of equipment that are subject to these requirements. This will include parts OEM parts or approved aftermarket parts when needed.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.