Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

October 31, 2024

December 15, 2024

Thirteenth St

Paving, Site Work

No Information to Display

$90,000.00

Public - City

img_map_placeholder

Thirteenth St, Clairton, PA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe to View Full Documents

Budget: $90,000 Additional doc acq note: Copies of Information for Bidders, Contract, Form of Proposal and Bid Forms, Plans and Specifications may be examined or obtained for bidding purposes from the GLENN ENGINEERING & ASSOCIATES, 14920 Route 30; North Huntingdon, PA 15642. Technical questions pertinent to the work to be performed under this Contract may be addressed to: Brad Branthoover Glenn Engineering & Associates, Ltd. 14920 Route 30 North Huntingdon, PA 15642 Phone: 412-824-5672 Fax: 412-824-9587 E-mail: Bradb@glennengr.com SCOPE OF WORK 1. 25 MM SUPERPAVE BINDER COURSE Contractor shall supply and install 4" as directed compacted depth of Superpave Binder Course Asphalt Mixer Design HMA Binder Mix Course, PG-64-22, 0.0 to 0.3 ESAL's including, but not limited to, all edge, surface cleaning and tack coat, complete and in place as per specification. 2. 19 MM SUPERPAVE BINDER COURSE Contractor shall supply and install 2" or 2 !6" as directed compacted depth of Superpave Binder Course Asphalt Mixer Design HMA Binder Mix Course, PG-64-22, 0.0 to 0.3 ESAL's including, but not limited to, all edge, surface cleaning and tack coat, complete and in place as per specification. 2. 9.5 mm SUPERPAVE WEARING COURSE Contractor shall supply and install 1-1/2" compacted depth of Superpave Wearing Course Asphalt Mixture Design HMA Wearing Course, PG-64-22,0.0 to 0.3 ESAL's including, but not limited to, all edge, surface cleaning, tack coat, keyways, adjustment to grade with all valve boxes, manholes and inlets required, transition into driveways as needed, driveway transition to include saw cutting or keyway, if required, or directed, by Engineering Representative in the field, complete and in place as per specification. 3. PAGE V 6 WEDGE CURB Contractor shall supply and install a 6" x 12"+- Bituminous Wedge Curb constructed of Superpave Binder Course Asphalt Mixer Design HMA Binder Mix Course, PG-64-22, 0.0 to 0.3 ESAL's, complete and in place as per specification. (See Wedge Curb Detail). Contractor shall supply and install Wedge Curb backfilling as directed by Engineering Representative. Backfilling, if necessary, should consist of top soil, seed, and mulch or 2A Modified Stone. Price for backfill shall be included with the wearing course bid item. 4. KEYWAYS/DRIVEWAY KEYWAYS Contractor shall construct Keyways for a smooth transition from new pavement to existing pavement. Keyways shall be a minimum of 3' wide tapered x 1-1/2" deep. Location shall be field located by the Engineer's representative. All materials will be disposed of at an approved site. Driveway keyways are to be done with a Barco Miller or jackhammer to lower existing asphalt in front of driveways as directed by the engineer's inspector. Size will vary according to driveway width. 5. RAISE MANHOLE/WATER/GAS VALVE LIDS/INLETS Contractor to locate and raise lid of existing manholes, water valves and inlets to perfectly match the level of the new pavement. Cast Iron rings are permitted. Steel rings are NOT permitted. For Inlets; contractor to taper around inlet 42" in all directions if inlet cannot be raised with a riser (No Exceptions). 6. STREET MILLING Contractor to remove existing asphalt material, or brick, by milling as directed by the engineering field representative. Contractor shall also remove asphalt wedge curb as directed, includes dust control and protection of all catch basins, includes sweeping and cost removal and disposal. Milling material to remain property of the City and to be hauled to a site within the City as directed by project representative

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects