Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

No Information to Display

1783 Arnold Ave

Renovation

No Information to Display

$100,000.00

Public - Federal

img_map_placeholder

1783 Arnold Ave, Andrews Air Force Base, MD

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe to View Full Documents

For questions concerning this RFP, please contact Procurement Specialist Corrine Carter at cartercenv.doe.gov /(936) 230-0270. General: The SUBCONTRACTOR shall provide all tools, labor, and materials necessary to perform contact hands-on work to modify the CONTRACTOR's existing interior wall to meet these requirements. Detailed Requirements: The SUBCONTRACTOR shall provide SUBCONTRACTOR shall perform demolition of existing demountable wall partition and door. SUBCONTRACTOR shall build and install Wall A as identified in the Technical Specifications for Construction and Management of Sensitive Compartmented information Facilities version 1.5. Only the applicable Technical Specification criteria to this project will be required SUBCONTRACTOR shall install an access door in the same location as the previous door. The STC 50 access door shall be compliant to the Technical Specifications for Construction and Management of Sensitive Compartmented information Facilities version 1.5, Chapter 9. The SUBCONTRACTOR shall provide detailed project sketches or drawings for CONTRACTOR review and approval prior to scheduled work. The SUBCONTRACTOR sketches shall be submitted no later than one week after subcontract award. The SUBCONTRACTOR shall remove and reattached all surface mounted items from the existing wall to the equivalent location and method for new wall. The SUBCONTRACTOR shall perform the following finishing work: Repair ceiling as needed at location of new wall. Paint rooms where the new wall is located to match the existing paint color for each side of the wall. Provide and install vinyl baseboard on new drywall partition. Provide and install new door seal two existing doors. Work Location: Remote Sensing Laboratory - Andrews - 1783 Arnold Ave., Rm 236, Andrews AFB, MD 20762 Offerors are encouraged to submit questions they want addressed. Questions must be submitted in writing and received by the addressee below no later than Monday, September 16, , at 12:00 PM ET. Each question must clearly identify the section of the Proposal (e.g. Exhibit B, Section 5.2.1) that it is referencing. Questions submitted will be answered without identifying the source and provided in writing.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects