Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 1, 2024

October 7, 2024

2901 Osceola Pkwy

Site Work

No Information to Display

$77,382.00

Public - County

img_map_placeholder

2901 Osceola Pkwy, Lake Buena Vista, FL

18

14

3

Subscribe to View Full Documents

Project Type Bid Response Types Line Items EXHIBIT B - Client Reference List (required) Foreign Countries of Concern Affidavit (required) Supporting Documents, if any Type of Award Lump Sum License Requirements Operator Qualified (OQ) - RCES (See Exhibit C) The Central Florida Tourism Oversight District (CFTOD or DISTRICT) is soliciting proposals from "qualified" contractors (Contractor) to relocate a natural gas line at Disney's Animal Kingdom Park Bus Loop (DAK Bus Loop). The line is being relocated to comply with gas regulations due to other construction activities at the same location. The DAK Bus Loop is located at 2901 Osceola Parkway, Lake Buena Vista, FL 32830. This work will be performed in coordination with other construction project(s) taking place at the same time and location. The term "qualified" is defined as any individual, firm, corporation or company that, either in person or through representative, is engaged in and is responsible for the installation, replacement or repair of Natural Gas Distribution Systems; is experienced in such work and familiar with all precautions required; and has complied with all the requirements of local, state and federal codes and standards including but not limited to FL25-12 and DOT PHMSA CFR 192. Contractor must comply with API 1104 welding procedures. Online Q&A Yes Q&A Deadline 09/16/2024 6:00 PM (EDT)

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.