Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

May 19, 2025

August 28, 2026

816 15th St

Renovation

No Information to Display

$3,100,000.00

Public - State/Provincial

img_map_placeholder

816 15th St, Golden, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Reference Number 0000362683 Job Location: Golden, Colorado The Colorado School of Mines (Mines), an exemplary institution in science and engineering and the state's oldest public institution of higher education, is seeking Architect / Engineer qualifications for a Capital Maintenance (CM) project on campus in Engineering Hall to replace heating and cooling system components. The Colorado School of Mines (Mines) seeks Architect / Engineer qualifications for a Capital Maintenance (CM) project on campus in Engineering Hall to replace heating and cooling system components. Engineering Hall is the oldest building on Mines campus where heating and ventilation systems are beyond their useful life, and replacement for the longevity of the building. Firms with demonstrated relevant experience, including at least two projects of similar size and complexity, are encouraged to apply. Relevant projects should be with local staff. The project delivery method is Design-Bid-Build (DBB). This project is one of two phases. Phase I has a Construction Budget of approximately $1,700,000. Phase II will be funded next fiscal year with a Construction Budget of approximately $1,400,000. The firm awarded Phase I may be awarded Phase II without further solicitation, at the sole discretion of the Colorado School of Mines. Anticipated Construction Services Start - Finish 05/19/2025 - 08/28/2026 Question Deadline 09/19/2024 at 3:00 PM MT

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.