Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 3, 2024

November 4, 2024

January 3, 2025

Credit Union Dr

Site Work

No Information to Display

$1,000,000.00

Public - City

img_map_placeholder

Credit Union Dr, Anchorage, AK

12

12

2

2

Subscribe to View Full Documents

Project Consists of demolishing the existing structure completely. Construct a new warm storage building. ESTIMATED CONSTRUCTION COST: Between: $500,001 - $1,000,000 The Municipality of Anchorage reserves the right to reject any and all bids and to waive any informalities in the bids. No bidder may withdraw his bid after the hour set for the opening of bids or before the award of contract unless said award is delayed for a period exceeding sixty (60) days from the time of the opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 09/17/2024 at 12:00 PM AKT All Questions Shall Be Submitted Prior to the Question Due Date This Will Be The Final Opportunity to Ask Questions or Request Clarifications. GENERAL STATEMENT AND EXTENT OF WORK All proposed Work for the Credit Union Drive Sewer Rehabilitation Project is located in Anchorage, Alaska, as shown on the Drawings. The Work included in this Contract consists of furnishing all labor, equipment, materials, supervision, and other facilities necessary to complete the Work set forth in the Plans, and Specifications, and terms of the Contract successfully. The Work that is presented in the Bid Proposal for this Contract consists of the Contractor to furnish and install approximately 658 linear feet of 8-inch PVC, C900 sewer main, 92 linear feet of 6-inch PVC, C900 sewer service connection, abandon in place by grouting 330 linear feet of existing 8" DI sewer main, remove and dispose of 453 linear feet of existing 8" DI sewer main, remove and dispose 6 existing SSMH's, construct 7 new Type A, SSMH's. Additionally, the Work includes but is not limited to trench dewatering, a temporary sewer bypass system, topsoil and seeding, and the restoration of all affected streets. It shall be the responsibility of the bidder to prepare the bid so that all materials and working arrangements harmoniously conform to the intent of the Contract Specifications and Special Provisions.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.