Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

No Information to Display

200 W 2nd St

Renovation

No Information to Display

$200,000.00

Public - City

img_map_placeholder

200 W 2nd St, Freeport, TX

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

For inquiries regarding this RFP, please contact Cathy Ezell, Finance Director by phone,979-871-0107, or email, cezell@freeport.tx.usThe deadline for inquiries is Friday, September13, 2024 at 5:00 P.M. The City of Freeport is Accepting Sealed Proposals for the roof replacement of the Freeport Old City Hall Building located at 200West 2nd Street. The Proposal should also include a cost for the replacement of the lower and upper roof,WPI8 Certificate and engineering. It is the responsibility of the submitting entity to ensure that the proposal is received in a timely manner. Proposals received after the deadline will not be considered for award, regardless of whether or not the delay was outside the control of the submitting firm. The City of Freeport reserves the right to negotiate with any and all persons or firms submitting timely bids *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. The scope of work includes: a. Perform all work in accordance with OSHA standards. b. Install Two Layers of 2.2" ISO 95+ in low Rise Adhesive 6" O.C. Bead Spacing c. Install One Layer of 1/2 " Densdeck Prime in Low Rise Adhesive 6" O.C. Bead Spacing d. Install One Layer of 60 Mil UltraPly Membrane with Fasteners, Heat Welded e. Install New Edge Metal with Continuos Hook Strip for High Wind Tolerance f. Replace Existing Counter-Flashing at Walls with New Counter-Flashing and Joint Sealant g. Install One Layer of 2x6 Nailers as Needed to Raise Existing Edge to New Roof Height h. Provide Warranty on completed work. i. Provide WPI8 Certificate and engineering. j. Provide Performance/Maintenance Bonds as required. k. Drive Through Roof (Non Conditioned Space) - Deck 1/2 " Coverboard, Membrane l. Eye Brow Roof (Non Conditioned Space) - Deck 1/2 " Coverboard, Membrane m. High Roof (Conditioned Space) - R-25 in low rise, Coverboard in Low Rise, Membrane in Bonding Adhesive

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects