Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 15, 2024

December 16, 2024

June 19, 2026

2223 G St

Renovation

No Information to Display

$4,230,410.00

Public - City

img_map_placeholder

2223 G St, Fresno, CA

47

6

4

4

Subscribe to View Full Documents

Project Type Bid Response Types Line Items Bid Bond Required Bid Documents (required) General Attachment General Attachment Type of Award Lump Sum Liquidated Damages $1000 Per Calendar Day Estimated Bid Value $4,230,410.00 Start/Delivery Date Date of Notice to Proceed Project Duration 550 Calendar Days from Notice to Proceed Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A No The scope of work includes addition of roof mounted fans for hydrogen detection system, replacement of insulated roll up doors, upgraded fire pump and outdoor generator to the Fresno FAX HVAC Bus Maintenance Facility. The hydrogen gas detection system scope of work shall: o Provide hydrogen exhaust air ductwork up through roof. o Provide hydrogen exhaust air ductwork. o Provide building automation system workstation. o Provide wall-mounted hydrogen and methane gas detection system main control panel. o Provide wall-mounted hydrogen and methane gas detection zone control panel. The fire protection system scope of work shall: o Provide electric fire pump. o Provide pressure-maintenance pump and piping. o provide fire pump suction and pump discharge piping. o provide electric fire pump and pressure-maintenance pump controllers. o Provide fire department connection. o Provide fire pump test header. o Provide fire pump bypass, fire pump test header and fire department connection piping. The Electrical scope of work shall: o Demolish the existing 150kw generator. Provide a new pull box to intercept existing feeders and conduit to feed the proposed new 300kw generator along with ATS and all other associated accessories. o Provide new 75kva transformer and new 250A, 120/208V, 3PH, 4W panel. o Provide new circuit breakers, conductors to serve rolling doors. o Provide new fusible disconnecting switches (NEMA 8 enclosure) and mechanical switches (with NEMA 3R enclosure). o Provide feeder and conduit to serve the proposed jockey and fire pump. Question Deadline 10/08/2024 Any questions or concerns relating to these Specifications shall be directed in writing to the designated Procurement Specialist of the Purchasing Division facsimile to the fax number on the cover page or emailed to tamra.torrence@fresno.gov.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.