Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

December 2, 2024

November 21, 2025

To Be Determined

New Construction, Site Work

No Information to Display

$25,000,000.00

Public - County

img_map_placeholder

To Be Determined, San Antonio, TX

213

26

22

4

Subscribe to View Full Documents

Direct questions to on or after 9/9/2024 from: MTR Engineers, LLC, 12770 Cimarron Path, Ste. 100, SAT 78249, 210-698-5051. Project requires Bid Bond & $100 refundable deposit. SCOPE OF WORK A. Work under this Contract includes all installation labor, materials, tools, transportation services, supervision, coordination, etc., necessary to complete the design/build installation of the Scoring Display Systems, as described in these specifications and illustrated on the associated drawings. The systems shall be called the Scoring Display Systems and the installer the Scoring Display System Installer B. The work specified herein is performance based. This requires the Installer to provide all subsequent design and engineering, which is not included within the Contract Documents, to meet the requirements of this Performance Specification. The drawings included with this specification convey system concepts. The plans do not necessarily show complete and accurate building details. The Installer is responsible for making field measurements necessary to establish exact locations, relationships, and load capacities necessary for the installation of these systems. C. Work includes fixed digit scoreboards and scoring system for baseball and softball fields. Drawings are conceptual in nature, illustrating the features and appearance of the system. The Scoreboard Installe shall assume full responsibility for final structural engineering, mechanical requirements as well as construction information and coordination required in accordance with the Installers final design of elements being provided under this contract.

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.