Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

April 1, 2025

July 31, 2025

5495 Chem. du Quai-Marcel-Dionne

Renovation, Site Work

No Information to Display

$350,000.00

Public - City

img_map_placeholder

5495 Chem. du Quai-Marcel-Dionne, Le Fjord-du-Saguenay, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number: 20017402 The Saguenay Port Authority has contracted the Beumer Group to design and manufacture an 1800-meter-long tubular conveyor. The conveyor consists mainly of 12m steel modules inserted in a modular gallery made up of 12 to 24m modules on the ground and in overhead structures. Assembly of the TT01 and TT02 transfer tower structures and installation of the mechanical components are the subject of this work package. Start Date 04/01/2025 End Date 07/31/2025

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects