Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

November 25, 2024

December 13, 2024

W Central St

Paving, Site Work

No Information to Display

$1,016,000.00

Public - City

img_map_placeholder

W Central St, Gates, OR

18

17

2

4

Subscribe to View Full Documents

ARPA Water Pipeline Improvements. Est. Completion Date: Nov. 29, 2024. Description: The Project generally consists of installation of new C-900 polyvinyl chloride (PVC) finished water pipeline and high-density polyethylene (HDPE) service lines and all labor, equipment, materials, and incidentals necessary to complete the Work as specified below and as shown on the plans: Base Bid Area A - Roundtree Way: Installation of 312 LF of 8-inch diameter and 11 LF of 6-inch diameter C-900 PVC waterline, associated valves, fittings, service lines, water meters, and fire hydrants located within existing public right-of-way that will connect to an existing 8-inch diameter waterline located on West Central Ave. Abandonment in place of existing 6-inch waterline as shown on the plans. Area B - Frontier Drive: Installation of 782 LF of 8-inch diameter and 354 LF of 4-inch diameter C-900 PVC waterline, associated valves, fittings, service lines, water meters, and fire hydrants located within existing roadway easements, permanent utility easements, and temporary construction easements that will connect to an existing 8-inch diameter waterline located in Oregon State Highway OR-22. Abandonment of existing 2-inch waterline as shown on the plans. Additive Bid 1 Area C - Gates School Road: Installation of 0.75-inch and 1-inch HDPE service lines, water meters, and fittings located within an existing roadway easement and temporary construction easement that will connect to an existing waterline located on Gates School Road. Abandonment of existing waterline as shown on the plans. Question Deadline 09/17/2024 Questions received less than seven (7) days prior to the date for opening of Bids may not be answered. Pamela Villarreal, PE, Project Engineer , pvillarreal@kellerassociates.com Sarah Rote, EI, Project Engineer, srote@kellerassociates.com Est. Value: $ 1,016,000.00

21 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects