Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 3, 2024

November 18, 2024

1211 E Pine Ave

Renovation, Site Work

No Information to Display

$587,802.00

Public - City

img_map_placeholder

1211 E Pine Ave, Lompoc, CA

6

8

2

Subscribe to View Full Documents

Fillmore Elementary School Gas Pipe Replacement Project Scope of Work: Replacee undrrggoounnd asppiign campus including final connections with shut off valves and seismic safety valves at buildings. Patch existing surfaces to match adjacent surface. The Bidder is required to possess the following State of California Contractor License: "A", "C-36", and/or "B" (acceptable if the bidder has either a C-36 license or subcontract to a C-36 licensee). The Bidder's license(s) must remain active and in good standing throughout the term of the Contract. To bid on this Project, the Bidder is required to be registered as a public works contractor with the Department of Industrial Relations pursuant to the Labor Code. The Bidder's registration must remain active throughout the term of the Contract. All bids shall be on the form provided by the District. Each bid must conform and be responsive to all pertinent Contract Documents, including, but not limited to, the instructions to Bidders. A bid bond by an admitted surety insurer on the form provided by the District, cash, or a cashier's check or a certified check, drawn to the order of the Lompoc Unified School District, in the amount of then percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid Questions must be submitted in writing/email ( purchasingteam@lusd.org by September 12, 2024, 5:00PM. Questions and Answers will be posted on the District website online. The Board of Education of the Lompoc Unified School District reserves the right to reject any and all submittals.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.