Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 20, 2024

October 21, 2024

November 28, 2025

1978 Hertel Ave

Site Work

No Information to Display

$500,000.00

Public - City

img_map_placeholder

1978 Hertel Ave, Buffalo, NY

31

16

15

4

Subscribe to View Full Documents

Work Included: Park improvements including pathways, electrical service upgrades, site lighting, security cameras and perimeter access controls. 1. The following as well as the current Standard Specifications for Construction and Materials, including all addenda, of the City of Buffalo Department of Public Works and New York State Department of Transportation shall become a part of and shall apply to this Contract. 2. The Contractor will not proceed with any construction until his proposed work schedule is approved by the Engineer. 3. During construction, the Contractor must provide safe access to all driveways whenever feasible. 4. The Contractor is to coordinate project activities with all public and private utilities, other contractors, private industries, the Buffalo Fire Department, the Niagara Frontier Transportation Authority, the Buffalo Police Department and/or any other public agencies in the Contract area. Prior to excavation, the Contractor shall request from all utility companies the locations of all their lines. 5. The Contractor is required to comply with current codes set forth by the Americans with Disabilities Act (ADA) at all locations requiring handicap ramps. 6. The Contractor shall repair or be responsible for all repairs made of all damages incurred by the Contractor during the construction at the Contractor's sole expense. 7. The City reserves the right to increase/decrease quantities as necessary at "no extra cost" to the City. 8. All the work will be performed under one contract. 9. Construction work hours shall be between 8:00 a.m. to 4:30 p.m. by Chapter #293 of the City Charter. 10. The Contractor shall generally limit his work days to eight (8) hours per day. Longer workdays may be permitted as necessary given permission of the E.I.C.

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.