Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

December 2, 2024

November 3, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$7,500,000.00

Public - City

img_map_placeholder

Multiple Locations, Alameda, CA

57

13

3

Subscribe to View Full Documents

The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removing and installing sanitary sewer mains, sewer laterals, maintenance holes, cleanouts, curb, gutter, sidewalk, driveway, street patch, water pollution control, traffic controls and all other associated work to complete the project at the locations designated in the plans This Project is situated on the following City streets: Mastick Court Gibbons Drive Lincoln Avenue Court Street Caroline Street Liberty Avenue Dayton Avenue Washington Avenue Chestnut Street, School Site/Restricted Hours Fillmore Street Santa Clara Avenue, School Site/Restricted Hours Island Drive Cedar Street Mecartney Road Versailles Avenue, School Site/Restricted Hours County Road Cornell Drive Garden Road Approximate cost of construction: 6.5 to 7.5 million The Contractor shall begin Work no later than five working days following the start date specified in the Notice to Proceed, which may be hand delivered or sent by email. The Contractor shall complete all Work on the Project within 240 Working days after the above start date. The Contractor, and all Subcontractors, shall pay all workers not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations ("DIR"), State of California, for the Work performed, pursuant to sections 1770 et seq. of the California Labor Code. Copies of the general prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the Contract, as determined by the DIR, are on file at the City. Prevailing wage rates are also available online Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight (8) hours. The rate for holiday and overtime work shall be at least time and one-half. Pursuant to Public Contract Code ("PCC") section 4104, no contractor or subcontractor shall be qualified to bid on, or be listed in a bid proposal unless currently registered to perform public work pursuant to Section 1725.5. No bids will be accepted from a Contractor who has not been licensed in accordance with Business and Professions Code section 7000 and following. The General Contractor shall possess a valid Class A construction license issued by the California Contractors State License Board for this Project. The City reserves the right to reject any or all bids; to waive minor defects or technicalities; or to solicit new bids. As per PCC section 20170, all bids shall be submitted under seal and accompanied by cash, a bidder's bond executed by an admitted surety insurer, a cashier's check. or certified check payable to the City of Alameda in an amount equal to 10% of the total amount bid (PCC 20171). Upon award of the contract, the successful Bidder shall furnish a bond for faithful performance in the amount of 100% of the total bid. The successful Bidder shall also furnish a bond to secure the payment of all claims for labor and material in the amount of 100% of the total bid. Further, the successful Bidder, and all subcontractors, shall pay for and obtain a City of Alameda Business License. Retention: The Contractor may elect to receive 100% of payments due under the contract from time to time, without the City retaining any portion of the payment, by depositing securities of equivalent value with the City or in an escrow agent pursuant to PCC section 22300. Such securities, if deposited by the Contractor, shall be valued by the City's Risk Manager whose decision on valuation of the securities shall be final. The Contractor's attention is called to the Business and Professions Code section 7108.5, which generally requires subcontractors to be paid not later than seven days after receipt of each progress payment. Please direct any Project questions to Shilpa Patel at spatel@alamedaca.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.