Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

October 28, 2024

No Information to Display

To Be Determined

Renovation

No Information to Display

$250,000.00

Public - Federal

img_map_placeholder

To Be Determined, Scott Air Force Base, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

The Contractor shall provide all labor, equipment, tools, materials, supplies and supervision to SUBJECT: Vindicator System Upgrade for HQ CCC Bldg 1700 Rm 2300 located in Scott Air Force Base, IL 62225 include all consumable items, transportation and other items and services necessary to provide and install the following: One (1) VSC Site Commander (Win10), five (5) 360-degree Motion Sensors, and one (1) new Vindicator Command and Control/Security Archive Workstations (VCC/SAW) to allow for system status and report generation as wells as, interface into the base's Vindicator System to allow alarm point viewing at the BDOC. The Contractor will also provide a firmware upgrade for government furnished V5ACS to convert it to a V5IDS. Contractor is responsible for the relocation of this unit from room 3108. Also, contractor to furnish and install one (1) new 3000W UPS in Rm 3303 equipment rack. In addition, delivery of equipment and start of contract will no later than 90 days after contract award. Once installation is completed, the contractor shall provide training on newly updated system. The contractor shall provide a certified technician on-site (HQ CCC bldg. 1700) within 48 hours from a call requesting warranty support. Please see below: RFQ Attachment 1 - SOW Attachment 2 - Equipment List Attachment 3 - Clauses Interested parties with questions are directed to ask questions in writing to the email addresses listed above. All questions shall be submitted by 25 September 2024, 2:00 PM CST. The point of contact for this acquisition is A1C Neil Calica; e-mail: neil.calica@us.af.mil. In the event this individual is not available, contact SSgt Tyler Murphy: e-mail tyler.murphy.3@us.af.mil.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects