Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

November 15, 2024

November 22, 2024

92nd Ave NE

Site Work

No Information to Display

$31,625,000.00

Public - State/Provincial

img_map_placeholder

92nd Ave NE, Bismarck, ND

8

17

4

Subscribe to View Full Documents

Water Resources Infrastructure The scope of Work consists of 3 Bid Schedules. The Project is located in Ramsey Co., North Dakota. The Work generally consists of the following: Construction involving the excavation of existing loose backfill and then re-backfilling of an existing 96" diameter steel transmission pipe including placement of controlled low strength material (CLSM), near East Devils Lake, North Dakota. Additional electrical work will include the movement and placement of electrical lines and boxes. The Work includes all transportation, labor, materials, tools, equipment, services, permits, utilities, and other items necessary to construct said Work. The Contractor will not perform Work or permit the performance of Work by subcontractors outside regular dusk to dawn working hours or on Saturdays, Sundays, or legal State holidays without providing written notice of proposed work to the Engineer a minimum of 5 days in advance and contingent on the Owner's written consent. Each Bid must be accompanied by a separate envelope containing a copy of a current and valid North Dakota contractor's license issued at least 10 days prior to Bid opening, and a Bidder's Bond in a sum equal to 5% of the full amount of the Bid, executed by the Bidder as Principal and by a Surety, conditioned that if the Principal's Bid is accepted and the Contract awarded to Principal, the Principal, within 10 days after notice of award, shall execute a Contract in accordance with the terms of the Bid and a Contractor's Bond as required by law and regulations and determinations of the North Dakota State Water Commission. Bidders shall submit proof of qualification to perform the Work as described in the Instructions to Bidders. The awarded Contractor(s) shall commence the Work under the proposed Contract within seven (7) days after the date provided in the Notice to Proceed, which will follow the Notice of Award. The Contractor(s) shall then complete the various parts of their contracted Work, ready for use by the NDDWR, no later than twenty-one (21) days after the date in the Notice to Proceed. The construction activities have an expected duration of approximately seven (7) to fourteen (14) days and shall occur sometime in October of 2024. A Pre-Bid Conference Call with the Engineer will NOT be held for this project. The Owner reserves the right to hold all Bids for a period of 90 calendar days after the date of the Bid opening to complete financial arrangements. Question Deadline 09/19/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Submit questions via email to james.landenberger@bartwest.com. Questions received less than seven days prior to the date for opening of Bids may not be answered.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.