Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

November 1, 2024

January 7, 2026

CO-103

Site Work

No Information to Display

$200,000.00

Public - City

img_map_placeholder

CO-103, Idaho Springs, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe to View Full Documents

Reference Number 0000362204 Job Location: City of Idaho Springs Road Name: State Highway 103 (Chicago Creek Road) Length: 16,500 feet Construction of approximately 16,500 feet of 16 inch C900 PVC waterline. All necessary labor, supervision, equipment, tools and materials for construction of approximately 16,500 feet of 16" C900 PVC waterline. Work includes but is not limited to hydrants, valves, tie-ins, new service line connections, erosion control, earthwork, cutting, patching, and repaving of roads, and all appurtenances as specified and required for a complete and functional system. The work also includes up to four creek crossings under a Nationwide Permit. All materials as indicated on the drawings and the specifications will be provided by the Contractor and must be installed along with the completion of all associated site work related to the new potable water line. The City reserves the right to reduce the or increase the scope of the work at the agreed unit prices at any time during the duration of the contract. Last day for questions is September 18th, 2024, 5:00 PM M.T. Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % No Bid will be received unless accompanied by a copy of a cashier's, certified or bank check or a Bid Bond equal to at least ten percent (10%) of the maximum Bid, payable to the Owner as a guarantee that after a Bid is accepted, Bidder will execute and file the Agreement and 100 percent Performance and Payment Bonds within ten days after the Notice of Award. All Bids shall remain subject to acceptance for 60 days after the time set for opening Bids. Owner is not obligated to accept the lowest cost proposal, reserves the right to reject any or all Bids, to waive any informality or technicality, and to accept any Bid which it deems advantageous. The Work will include all necessary labor, supervision, equipment, tools, and materials for construction of approximately 16,500 feet of 16" C900 PVC waterline. Work includes but is not limited to hydrants, valves, tie ins, new service line connections, erosion control, earthwork, cutting, patching, and repaving of roads, and all appurtenances as specified and required for a complete and functional system. The work also includes up to four creek crossings under a Nationwide Permit. All materials as indicated on the drawings and the specifications will be provided by the Contractor and must be installed along with the completion of all associated site work related to the new potable water line. The City reserves the right to reduce the or increase the scope of the work at the agreed unit prices at any time during the duration of the contract. All materials as indicated on the drawings will be provided by the contractor and must be installed, along with the completion of all associated site work relating to the new waterlines.

59 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects