Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 25, 2024

November 25, 2024

August 2, 2025

281 W Lane Ave

Renovation

No Information to Display

$1,850,000.00

Public - State/Provincial

img_map_placeholder

281 W Lane Ave, Columbus, OH

30

18

10

4

Subscribe to View Full Documents

Installation and maintenance of highway and street lighting, highway and street sign lighting, electronic message boards and traffic control systems, camera systems, traffic signal work, substation and line construction including overhead and underground projects for private and industrial work as in accordance with the IBEW Constitution. This Agreement includes the operation of all tools and equipment necessary for the installation of the above projects. In compliance with Section 153.08 of the Ohio Revised Code and Section 153:1-8-01 of the Ohio Administrative Code, Bids for this Project are being received, opened, and published through electronic means using the State's electronic bidding service. Bidders are encouraged to be enrolled in and to be in good standing in a Drug-Free Safety Program ("DFSP") approved by the Ohio Bureau of Workers' Compensation ("OBWC") prior to submitting a Bid and provide, on the Electronic Bid Form with its Bid, certain information relative to their enrollment in such a program; and, if awarded a Contract, shall comply with other DFSP criteria described in Section 1.6 of the General Conditions. Electronic bids will be received for: Trade Estimate General Contract 1,850,000 Alternate 1 $ 525,000. The EDGE Participation Goal for the Project is 5.0 percent. The Contracting Authority has a goal to provide 5% opportunity for EDGE certified companies to perform work on the Contracting Authority's prime contracts. Apparent Low Bidders that are incapable of identifying 5% of work on prime contracts for fulfillment by EDGE certified companies must complete all sections of the Demonstration of Good Faith form. The apparent low bidder shall thoroughly document its efforts to identify work for EDGE certified companies. The apparent low bidder may request the owner to waive the 5% participation goal in part or in total. The apparent low bidder shall submit a Request for Waiver on company letterhead. The Apparent Low Bidder shall address the following in its Request for Waiver: o Describe in overall terms the conditions that prevented the Apparent Low Bidder from providing 5% of the work on the prime contract to EDGE certified companies, o Identify what percentage of the work on the prime contract is suitable for performance by EDGE certified firms, o Request the Contracting Authority to waive the 5% participation goal in part or in total.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects