Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

October 28, 2024

August 29, 2025

Multiple Locations

Site Work

No Information to Display

$235,090.00

Public - City

img_map_placeholder

Multiple Locations, Lexington, MA

14

5

7

2

Subscribe to View Full Documents

RRFBs at Roadway Crossings includes installation of up to seven RRFB systems and adding LED "no turn on red" signs to a traffic signal system. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Question Deadline 09/13/2024 All pre-bid questions concerning the contract documents and the work contained therein must be submitted in writing to, and received by, Ross Morrow, P.E., Assistant Town Engineer, 201 Bedford Street, Lexington, MA 02420 The work under this contract consists of furnishing all necessary labor, materials, equipment and services to complete roadway improvements as described herein under the RRFB AT ROADWAY CROSSINGS CONTRACT #25-39. The work under this contract includes a Base Bid and two (2) Add-Alternate Bids. The work under the Base Bid includes the installation of five (5) Rectangular Rapid Flashing Beacon (RRFB) locations along the Minuteman Commuter Bikeway and installation of "No Turn on Red" LED blank out (NTOR) signs at the intersection of Massachusetts Avenue at Maple Street in Lexington, MA. The work under the each Add-Alternate bid includes the installation of a Rectangular Rapid Flashing Beacon (RRFB) along the Minuteman Commuter Bikeway in Lexington, MA. At RRFB locations, in addition to the installation of the assemblies, the work will include earth excavation, sidewalk and/or pedestrian curb ramp reconstruction, conduit installation with service connections, pull boxes, traffic signs, and pavement markings, and other incidental work. The RRFB assemblies are proposed as a mix of solar-powered or AC-powered pairs for each location. The improvements are proposed at the following locations: Woburn Street at Minuteman Commuter Bikeway (Location 3) Fletcher Avenue at Minuteman Commuter Bikeway (Location 4) Meriam Street at Minuteman Commuter Bikeway (Location 5) Revere Street at Minuteman Commuter Bikeway (Location 6) Westview Street at Minuteman Commuter Bikeway (Location 7) Bow Street at Minuteman Commuter Bikeway (Location 1) - Add-Alternate 1 Fottler Avenue at Minuteman Commuter Bikeway (Location 2) - Add-Alternate 2

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects