Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 9, 2024

December 9, 2024

November 14, 2025

3100 NW Hillman Rd

Site Work

No Information to Display

$1,038,000.00

Public - County

img_map_placeholder

3100 NW Hillman Rd, Jensen Beach, FL

18

16

27

3

Subscribe to View Full Documents

Martin County is seeking bids from licensed Contractors for the removal and replacement of the two (2) existing Filter Dosing Pumps, the installation of one (1) new Filter Dosing Pump and the installation of one (1) new Variable Frequency Drive (VFD) at the Martin County North Wastewater Treatment Plant Facility. Substantial completion shall be within 280 calendar days (from issuance of Notice to Proceed). Bid must be accompanied by the County's Bid Bond form, including those applicable to the sureties for the Statutory Payment Bond and Common Law Performance Bond. The bond shall be on the Bid Guaranty form provided by the County, with Power of Attorney Affidavit attached, in the amount of 5% of the total bid amount (base bid plus any and all alternates). Alternate bond forms will not be accepted. Failure to provide the County bond forms may deem the bid nonresponsive. In lieu of the Bid Bond, the bid may be accompanied by a certified check of any national or state bank made payable to the County in the amount of 5% of the total bid amount. Any certified check that may be received will be returned to the unsuccessful bidder(s), within thirty (30) calendar days after the opening of the bids. Bid bonds will not be returned to the bidders unless specifically requested by the bidder. Any certified check of the successful bidder(s) will be returned to them promptly after the County and the successful bidder(s) have (i) executed the Contract. Failure of the County to execute the Contract within ninety (90) days after the date of the bid opening shall initiate release of the Bid Bond, certified check, cashier's check, treasurer's check or bank draft of lowest and second lowest bidders unless mutually agreed otherwise The County reserves the right to reject any and all bids when (i) such rejection is in the interest of the County; (ii) such bid is void per se; or (iii) the bid contains any irregularities, provided, however, that the County reserves the right to waive any minor irregularities and to accept the lowest responsible and responsive bid determined by the County. Bids may be considered irregular if there are omissions, unauthorized alterations of any forms, additions not called for, conditional or unauthorized alternate bids, or other irregularities of any kind. The County reserves the right to request a written confirmation of the bid and the responsibility of the bidder prior to the awarding of the Contract. Failure of the bidder to confirm the bid within seven (7) working days from the date of the County's request may render the bid non-responsive and will entitle the County to award to the next lowest bidder and may require forfeiture of the bid bond Question Deadline 10/07/2024 at 5:00 PM ET Every request for interpretation shall be in writing and e-mailed to Purchasing at pur_div@martin.fl.us

25 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.