Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

No Information to Display

455 N 10th St

Paving, Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

455 N 10th St, Omaha, NE

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Parking Lot Lamp Replacement at CHI Health Center Omaha. SCOPE OF PROJECT This project is to remove the existing 400 W HID lamps, bypass the ballast, and replace with 75 GE LED lamps in parking lots A, B, and D at CHICHO. Bidder is responsible for providing all materials, supplies, labor, and equipment (including lifts), necessary to perform and complete all aspects of the work outlined in this RFP. Existing lights to be removed are Phillips PHI 42602-3 PHI MH400/U/ED28 MH 400W MOG BASE CLEAR COMPACT. Light Poles are 480v. Product Specifications Products must be the exact manufacturer and design as specified below. Alternates will not be considered. GE LED Lighting (see Attachment B) o Manufacturer: GE o Model LED HID-Type B o Color: 4000k o Bulb Shape: ED 28 o Watts: 150 o Base Type: EX39 o Order Code: 93139849 o Quantity Installed: 75 o Quantity Attic Stock: 25 General information o Products must be installed in accordance with manufacturer specifications. o Bidder shall obtain all necessary permits and licenses for the Work. o Bidder will adhere to all codes, ordinances, or other regulatory requirements covering the scope of this project. o Bidder must provide sufficient safety and pedestrian barriers while work is in progress. o The successful Bidder must receive materials directly from suppliers/manufacturer. Storage is not available at CHICHO. MECA will work with the successful Bidder to identify a temporary staging area when the project begins. o MECA will provide dumpsters for items that don't have specific disposal regulations. o Bidder is responsible for keeping work areas in a safe and orderly mannercleaning work area upon completion each day and at conclusion of project. o Bidder must protect all adjacent areas not receiving work under the project and repair any damage to these areas at their own expense. o The successful Bidder must provide MECA the name and cell phone number of the project lead that will be on site every day. Question Deadline 09/16/2024 at 2:00 PM CT

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.