Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 26, 2024

October 28, 2024

December 1, 2026

250 Wolverine Trail

Addition, Renovation

No Information to Display

$500,000.00

Public - County

img_map_placeholder

250 Wolverine Trail, La Vergne, TN

322

74

60

3

Subscribe to View Full Documents

La Vergne High School Renovations PROJECT DESCRIPTION: Work includes, but is not limited to, new addition of approximately 78,529 square feet on three levels and renovation of approximately 1,547 square feet on first floor, and new one-story Barn of approximately 2,262 square feet. Construction includes exterior and interior load bearing block walls, brick veneer, metal wall panels, concrete slab on grade, concrete and block foundation walls and concrete footings. Second floor construction is concrete plank with topping slab. Roof construction is fully adhered EPDM roofing over rigid insulation over metal deck, sloped to exterior gutters and downspouts, and metal roof panels. Windows are aluminum storefront; exterior doors and frames are hollow metal. Interior doors are solid wood with plastic laminate faces. Interior finishes include, but are not limited to, vinyl composition tile, resinous flooring, carpeting and sealed concrete. Interior wall finish includes epoxy paint and ceramic tile. Ceilings are suspended grid with lay-in acoustical tile and limited painted gypsum board ceilings. Complete mechanical, plumbing, fire protection, and electrical systems are included. Complete site work is included in the project. Question Deadline 09/17/2024 Questions about the meaning or intent of the Bid Documents shall be directed to the Architect, in writing

22 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects