Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 18, 2024

October 18, 2024

April 26, 2025

162 Minuteman Pkwy

Renovation

No Information to Display

$789,200.00

Public - State/Provincial

img_map_placeholder

162 Minuteman Pkwy, Frankfort, KY

24

20

17

4

Subscribe to View Full Documents

Updates to restrooms include replacing plumbing fixtures, lighting, floor and ceiling, and wall finishes throughout the interior of the existing Facilities Building 162 at the Boone National Guard Center in Frankfort, Ky. The overall upgrades also include a new breakroom layout with new plumbing fixtures, cabinets, countertops, and appliances. Select offices and a conference room will receive new carpet tile, and all corridors will receive new MMA flooring. A new connector with a building entrance will be constructed to connect to separate building corridors, enclosing an existing outside walkway. The new connector will be masonry wall construction with light gauge framing and a new SBS membrane roof. A new corridor will be constructed to improve interior circulation. New concrete masonry will be installed on the exterior of the building along with new foundation drain tile. Site work is required to remove a building adjacent earth-berm and excavation for new foundation drain provisions. HVAC work includes replacing electric wall heaters. Electrical upgrades include new LED light fixtures with occupancy sensor lighting controls throughout the project area. Question Deadline 09/09/2024 All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer. Unless otherwise specified in the Solicitation, questions received less than ten (10) calendar days prior to the date for receipt of bids may not be answered.

66 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.